Bathroom SAN DIEGO
Make Every Bath Feel Better
Tile, waterproofing, fixtures and layout, rebuilt by one licensed contractor who gets the parts behind the wall right.
IR-100 · Bathroom
The Tile Is the Last Thing That Matters
A bathroom is the wettest room in the house and the only one where a small mistake stays hidden. Water finds a gap behind the tile, soaks the substrate and shows up two years later as a stain on a ceiling below.
Waterproofing, slope to the drain, the right backer board and a properly formed shower pan are what decide whether a bathroom lasts.
We build that layer correctly, then set tile on top of it. In that order, every time.
IR-200 · What We Build
Every Kind of Bathroom Remodel
A full rebuild, a tight guest bath, or the shower that has to be replaced.
01
Stripped to the studs and rebuilt: layout, waterproofing, tile, fixtures and lighting.
02
Compact guest and hall baths reworked for storage and space inside the same footprint.
03
Larger primary suites with double vanities, separate showers and freestanding tubs.
04
Replacing an unused tub with a full walk in shower, often in the same footprint.
05
Membranes, backer board, shower pans and tile set on a substrate built to stay dry.
06
Vanities, tops, faucets, toilets, exhaust and the circuits and lighting behind them.
07
Curbless entries, grab bar blocking and comfort height fixtures for aging in place.
08
Bathroom plus two or more rooms? That is a whole home project, not a bathroom one.
IR-300 · How We Build
Where Bathroom Remodels Go Wrong
D-01 · Water
Everything Fails at the Waterproofing
Tile and grout are not waterproof. The membrane behind them is. Shower pans get formed with the correct slope to the drain, corners and changes of plane get detailed properly, and the substrate is board rated for wet areas rather than ordinary drywall.
D-02 · Layout
A Small Bathroom Is a Puzzle
Most San Diego bathrooms are small, and gaining usable space is about millimetres and clearances rather than square footage. Some fixtures move cheaply and some do not, because a toilet drain is a very different job from a vanity. We map that first.
D-03 · Older Homes
What Is Behind the Wall
Plenty of housing stock here dates from the fifties and sixties, and opening a bathroom wall can reveal aged supply lines, cast iron drains or a soft subfloor. Homes of that era can also hold materials that need testing before demolition. We look before quoting.
Tell us about your SPACE
Share your project and goals below. Our team reviews every inquiry and follows up within one business day to schedule your design consultation.
- Call (858) 264-0358
- Email office@kanbuildersinc.com
- Studio 4883 Ronson Court, Suite S, San Diego, CA 92111
To save your data, the contact form loads on request.
IR-400 · See It First
See Your Bathroom Before We Build It
IR-500 · Recent Work
Interior Transformations
G-01
G-02
G-03
G-04
G-05
G-06
G-07
IR-600 · Costing Matters
What a Bathroom Remodel Costs
Bathrooms are priced by complexity more than by size. Six things move the number.
Size & Scope
A guest bath refresh and a full primary suite rebuild are different projects entirely.
Tile & Surfaces
Tile area, material, format and pattern. Labour rises faster than material on intricate work.
Waterproofing & Substrate
Membrane system, backer board and shower pan. The layer we will not let a quote skip.
Fixtures & Vanity
Vanity, top, toilet, faucets, shower valve and glass, at a wide range of price points.
Moving Plumbing
Relocating a drain or a toilet means opening a floor. Moving a vanity usually does not.
Behind the Walls
Aged pipework, soft subfloor or existing water damage found once demolition starts.
Every bathroom is priced from a measured plan with the waterproofing system named, not assumed. If a cheaper quote does not say what is going behind the tile, that is where the difference is.
IR-700 · CLIENT REVIEWS
TRUSTED BY SAN DIEGO
They handled design, permits, and the build without us chasing anyone. The kitchen finished on the timeline they gave us in week one.
The renderings meant we knew exactly what we were getting. What we walked into on the final day looked just like the drawings.
Our project manager sent updates every single week. After the stories we heard from neighbors, this felt genuinely different.
IR-800 · COMMON QUESTIONS
Bathroom Remodeling, Answered
How much does a bathroom remodel cost in San Diego?
Scope and complexity drive it more than square footage. A guest bath keeping its layout, with new tile, vanity and fixtures, sits at the bottom of the range. A full primary suite with a large tiled shower, glass, double vanity and relocated plumbing sits well above. Moving a drain and anything found behind the walls adds cost on top. We price from a measured plan with the waterproofing system specified.
How long does a bathroom remodel take?
Most bathrooms run two to four weeks on site, with design, selections and any permitting ahead of that. Tile and waterproofing need cure time between stages that cannot be compressed, and custom glass is usually measured after tiling and then takes time to arrive. That glass wait is why a bathroom can look finished and still not be usable.
What if it is our only bathroom?
We plan around it. In a single-bathroom home, we sequence the work so the room is out of service for the shortest possible stretch, order every fixture and the tile before demolition, and tell you plainly which days you will need another option. What we will not do is start a single bathroom job with materials still on order.
Do I need a permit to remodel a bathroom?
Usually, if plumbing, electrical or ventilation changes. Replacing fixtures in the same positions is treated differently from relocating a drain, adding circuits or altering the exhaust. Requirements vary across county jurisdictions. We confirm what applies to your project, pull the permits and meet the inspectors.
Should I convert my tub to a shower?
It depends on the house rather than on taste. If it is your only bathroom, keeping one tub is usually the wiser call for resale, especially with families as buyers. If you have another tub elsewhere and this one goes unused, converting it to a walk-in shower almost always makes the bathroom more usable, and it is often possible inside the existing footprint.
How do I know the waterproofing was done properly?
You will not be able to see it once tile is on, which is exactly why it gets skipped. We tell you which membrane system we are using, and the wet areas are inspected and photographed before tile goes on so there is a record of what is behind the wall. Ask any contractor bidding your bathroom to name their waterproofing system. The answer tells you a lot.
Can you fix a shower that is already leaking?
Often, yes, and the first job is finding out how far the water has traveled. A leak at a valve or a failed grout line is a contained repair. Water that has been getting behind a pan or a membrane for years usually means the shower needs rebuilding, because the damage is in the substrate rather than on the surface. We will tell you which one you have.
KAN BuildersStart the Conversation
Build With a Team That Draws First
Send one photo of your bathroom and tell us what does not work about it. You get a 3D rendering and an itemized estimate before anything is ordered.